🔥 Terrifying Technical Parameters of Planetary Engines

According to the movie's setting, planetary engines need to generate 1.5 trillion tons of thrust to push Earth out of the solar system. This means:

Single Engine Weight

About 15 million tons

Equivalent to 300 Eiffel Towers

Foundation Depth

At least 500 meters

Must withstand extreme crustal pressure

Construction Period

5-8 years per unit

12,000 units needed globally

Concrete Usage

8 million m³ per unit

Global total could fill the Mediterranean Sea

⚙️ 7 Core Construction Machinery Lineup

1. Super Excavator: Caterpillar 6090FS

  • Operating Weight: 1,000 tons, bucket capacity 52 m³
  • Engine Power: 2,500 kW, fuel consumption 450 L/h
  • Key Mission: Excavate 500-meter deep engine foundations
  • Price: About 280 million RMB/unit, 300 units needed simultaneously

2. Giant Crawler Crane: Liebherr LR 13000

  • Max Lifting Capacity: 3,000 tons, main boom length 216 meters
  • Engine Power: 1,200 kW, self-weight 1,500 tons
  • Key Mission: Install engine core components
  • Price: About 420 million RMB/unit, 200 units needed

3. Mining Dump Truck: BelAZ 75710

  • Load Capacity: 450 tons, self-weight 360 tons
  • Engine Power: 3,450 kW, max speed 64 km/h
  • Key Mission: Transport special steel for engines
  • Price: About 50 million RMB/unit, 5,000 units needed

4. Concrete Pump Truck: SANY 86-meter Pump

  • Max Pumping Height: 86 meters, pumping capacity 210 m³/h
  • Engine Power: 385 kW, placing radius 74 meters
  • Key Mission: Continuous pumping of high-temperature resistant concrete
  • Price: About 28 million RMB/unit, 1,200 units needed

5. Rotary Drilling Rig: XCMG XR800E

  • Max Drilling Diameter: 7.5 meters, drilling depth 170 meters
  • Engine Power: 783 kW, torque 800 kN·m
  • Key Mission: Install engine anchor piles
  • Price: About 45 million RMB/unit, 800 units needed

6. Mining Excavator: Komatsu PC8000

  • Operating Weight: 710 tons, bucket capacity 42 m³
  • Engine Power: 2 x 1,490 kW, fuel consumption 600 L/h
  • Key Mission: Excavate engine exhaust ports
  • Price: About 360 million RMB/unit, 150 units needed

7. Crawler Bulldozer: Shantui SD90-5

  • Operating Weight: 106 tons, engine power 783 kW
  • Max Tractive Force: 1,880 kN, blade capacity 36 m³
  • Key Mission: Level engine installation sites
  • Price: About 32 million RMB/unit, 2,000 units needed

💰 Key Equipment Investment Analysis

Equipment Type Unit Price (Billion RMB) Quantity Needed Total Investment (Billion RMB) Investment Share
Giant Crane 4.2 200 840 28%
Super Excavator 2.8 300 840 28%
Mining Dump Truck 0.5 5,000 250 8%
Concrete Pump 0.28 1,200 336 11%
Drilling Rig 0.45 800 360 12%
Mining Excavator 3.6 150 540 18%
Bulldozer 0.32 2,000 640 21%

Total Investment: 380.6 Billion RMB (equipment only)

🚜 Construction Organization & Technical Challenges

Key Construction Milestones

Site Preparation Phase
2,000 bulldozers operating simultaneously, 6 months completion
Foundation Excavation Phase
300 super excavators, 18 months to complete 500-meter deep pits
Pile Foundation Phase
800 drilling rigs, 12 months to complete anchor system
Main Installation Phase
200 giant cranes, 24 months to complete core component installation
Concrete Pouring Phase
1,200 pump trucks, 8 months continuous operation

Core Technical Challenges

Foundation Stability

Must withstand 1.5 trillion tons of thrust reaction force

Material Temperature Resistance

Engine surface temperature reaches 3,000°C during operation

Synchronization Precision

12,000 engines must ignite simultaneously with error less than 0.1 seconds

Seismic Requirements

Must withstand magnitude 12 earthquakes without affecting thrust output

💡 Investment Returns & Market Opportunities

Business Opportunities for Equipment Manufacturers

Caterpillar

Potential orders of 84 billion RMB, equivalent to 3 years of global revenue

SANY

Pump truck orders of 33.6 billion RMB, could build 2 more SANY industrial parks

XCMG

Drilling rig orders of 36 billion RMB, market value could triple

Career Prospects for Operators

Operator Salary

50,000-80,000 RMB/month (special equipment operation)

Technical Engineers

800,000-1.2 million RMB/year (system debugging)

Project Duration

10 years stable employment, 500,000 technical workers needed globally

Conclusion

Although planetary engines may seem like science fiction, the construction machinery demand they reflect represents real market opportunities. When science fiction becomes reality, the first to benefit are always those construction machinery companies that hold core technologies and dare to challenge limits. The next trillion-level market might be hidden just beyond the boundaries of our imagination.